Most projects are one of three kinds. We tell you which, in writing, before anything starts.
We deliver
Work we do ourselves, start to finish: the website, catalogue, quote process, portal or reports.
One team, one point of contact, one written scope. We design, build, test and hand over, and we stay responsible for it until it is signed off.
We coordinate
Projects we can be responsible for. We get the right people to kickoff, chase the documents and keep you informed.
Useful when several suppliers or contractors are involved and someone needs to keep it moving. We hold the checklist, the dates and the updates; each supplier stays responsible for their own work.
Specialist-led
When the work needs a qualified engineer, you appoint and pay the specialist directly. They own the technical advice and the sign-off. We can coordinate around them, and we never present their work as ours.
You keep a direct relationship with the specialist. We can scope our part separately, for example the documents, the portal or the coordination, so responsibilities are never blurred.
From first email to handover.
Five stages. Each one ends with something you can see and check.
stage 101 / 05
Discovery
We look at one process with you: how it runs today, who touches it and what it costs in time. If it needs a specialist, we say so here.
From you: An hour or two with the people who run the process.
stage 202 / 05
Scope
A written scope: what we build, what we need from you, what is not included, and what would change it. Nothing is assumed.
From you: Read it, question it, and say yes or no.
stage 303 / 05
Kickoff
The checklist. Each item that blocks the start has an owner and a date. Work starts when the start is ready, not before.
From you: The files and decisions on the checklist.
stage 404 / 05
Build
Work in small, visible steps. You see real progress early, starting with a first result we agree up front.
From you: Quick answers from the person who approves the work.
stage 505 / 05
Handover
Training, a handover document with every login and setting, and a check after your team has used it for real.
From you: The people who will run it, in the room.
You always know where it stands.
The same habits on every project, whatever its size.
A next step, always
Every project has a next action with an owner and a date. If it slips, you hear it from us first.
Updates on a set day
You get a written update on an agreed date, not when someone remembers.
Decisions written down
When something is decided, the decision and the reason are recorded, so nobody has to remember it.
One point of contact
Keane for the relationship, Zidan for the work. You never have to wonder who to ask.
project0 of 4 in
Catalogue and quote requests
Discovery
Scope
Kickoff
Build
Handover
Scope agreed in writingfrom Human QuarterDue in 2 days
Written acceptancefrom your teamDue in 2 days
Who approves the work on your sidefrom your teamDue in 3 days
Full product spreadsheetfrom your teamBlocks the start
One item blocks the startFirst result: Catalogue structure with 20 sample products, 10 working days after the spreadsheet arrives.
Accepted is not the same as ready.
Every project opens with a kickoff checklist: what blocks the start, who provides it, who chases it, and by when. Nothing starts until the start is ready, and you always know the next step and whose it is.
The checklist is drawn from the system we run every project on. We built it the same way we build yours.
How projects are priced.
After discovery, in writing. The scope says what is included, what is not, and what would change it, so the price never moves without a reason you can see. Smaller pieces of work, like a discovery on its own or project coordination, are scoped on their own.
Include roughly when it needs to be live, and a budget if you have one in mind. We reply to everything within two working days, including the ones we cannot take.
Keane looks after the relationship. Zidan scopes and delivers the work.